Industrial batteries solve a critical timing problem for data centers: by shaving peak demand, they reduce grid interconnection wait times from ~5 years to months, accelerating buildout while existing grid capacity absorbs 76 GW of new load. Real regulatory tailwind and economics make this a durable bridge solution.